top of page

The 6m Galvanized Sliding Gate Track is a heavy-duty, corrosion-resistant track designed for embedding in concrete. It provides smooth and reliable operation for sliding gates in residential, commercial, and industrial applications. Built from high-quality galvanized steel, it ensures long-term durability and performance.

Sliding Gate Track In Concrete Galvanised 6m

SKU: 364215376135200
$175.20Price
Quantity
  • The 6m Galvanized Sliding Gate Track is a heavy-duty, corrosion-resistant track designed for embedding in concrete. It provides smooth and reliable operation for sliding gates in residential, commercial, and industrial applications. Built from high-quality galvanized steel, it ensures long-term durability and performance.

     

    Features

    • Length: 6 meters long, providing sufficient track length for sliding gates of various sizes.
    • Material: Made from high-quality galvanized steel, offering excellent strength and durability.
    • Corrosion Resistance: Galvanised finish protects the track from rust and corrosion, making it ideal for outdoor use.
    • Heavy-Duty: Designed to handle the weight of heavy sliding gates, ensuring long-lasting performance.
    • In-Ground Installation: Intended for embedding in concrete, providing stability and a smooth surface for gate movement.
    • Smooth Operation: Ensures smooth and consistent sliding motion for gates, reducing wear on wheels and gate components.
    • Versatile Application: Suitable for residential, commercial, or industrial sliding gate systems.

    Installation

    • Prepare the Foundation:
      • Mark the path where the gate track will be installed. Ensure that the track is aligned with the sliding gate’s path.
      • Dig a trench along the marked path to accommodate the track. The trench should be deep enough to fully embed the track in concrete.
    • Prepare the Concrete:
      • Mix the concrete according to the manufacturer’s instructions. Ensure that the mixture is consistent and smooth.
    • Lay the Track:
      • Place the sliding gate track into the trench. Ensure the track is level and properly aligned with the gate’s movement path.
      • Use a spirit level to verify that the track is perfectly horizontal, ensuring smooth gate operation.
    • Pour the Concrete:
      • Carefully pour the concrete into the trench, embedding the gate track.
      • Use a trowel to spread and smooth the concrete around the track, ensuring that the track remains level and secure.
    • Final Adjustments:
      • Double-check the alignment and level of the track as the concrete sets.
      • Allow the concrete to cure according to the recommended time (usually 24 to 48 hours), ensuring the track is fully stabilized.
    • Test the Gate:
      • Once the concrete is cured, install the gate on the track.
      • Slide the gate along the track to ensure smooth operation and make any final adjustments as needed.
bottom of page